Ariens 920402 - Sno-Tek 24E Operator's Manual Page 26

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 25
EN – 25
Install Bushing
1. Install new bushing onto axle and align holes with
holes in frame.
2. Secure bushing to frame with two tapping screws from
inside frame and tighten hardware.
See Figure 39.
3. If reinstalling bushing on right side of frame, align spur
gear with pinion gear, center axle and reinstall roll pin
into axle.
4. Reinstall flat steel washer onto axle.
5. Reinstall bottom cover and secure with six hex bolts.
6. Reinstall wheels and secure with axle lock pins.
7. Return unit to operating position.
8. Fill fuel tank and reconnect spark plug wire.
CHUTE GEAR REPLACEMENT
Remove Pinion Gear
NOTICE: Save all hardware for reinstallation unless
specified otherwise.
1. Stop engine, remove key and wait for all moving parts
to stop and for hot parts to cool.
2. Disconnect spark plug wire from engine.
See Figure 40.
3. Remove hardware retaining chute gear cover to pinion
gear bracket and remove cover.
4. Remove spring clip from chute rotation rod and
remove rod.
Figure 39
1. Axle
2. Spur Gear
3. Pinion Gear
1
32
Figure 40
1. Tapping Screw
2. Chute Gear Cover
3. Spring Clip
4. Chute Rotation Rod
1
2
4
3
Page view 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 32

Comments to this Manuals

No comments