Date: October 1, 2010 No. L-2178
INITIAL SETUP (SEE OWNERS MANUAL FOR FULL DETAILS AND DIAGRAMS)
Setup consists of unfolding the handlebar, installing the discharge chute, connecting the two batteries,
installing the discharge chute crank, installing the remote deflector cable, charging the batteries,
checking the function of the dual handle interlock, checking the tire pressure, checking the auger gear
case oil, and checking the function of all controls and the run-in attachment belt.
When connecting the two batteries, make sure that the connectors are fully seated and locked in
place. In addition to battery protection, the battery cover acts as the hold-down for the batteries. Do not
operate the unit without the cover securely installed with all hardware.
The batteries must be charged for a minimum of 7 hours before the first use. Again, the batteries must
be hooked up to the charger after every use, regardless of the length of time the unit was operated.
Failure to keep batteries fully charged will reduce battery life and void battery warranty.
OPERATION AND CUSTOMER TRAINING
Pre-Start
1. Unplug the AMP 24 from the battery charger.
2. Adjust axle lock pins, skid shoes, and discharge chute to desired position.
Starting
1. Ensure that PTO switch is not engaged.
2. Insert key and turn power switch to the ON position. The LED battery level indicator will glow.
3. Engage PTO switch, drive motor will run.
4. Select speed control position and direction.
5. Engage attachment clutch (right-hand lever).
6. Engage traction drive clutch (left-hand lever) and plow snow.
Stopping
1. When stopping, release the traction drive lever and allow the unit to come to a complete stop.
2. Run the impeller a few minutes after use to prevent freeze-up of impeller.
3. Release attachment clutch lever and wait for all moving parts to come to a stop.
4. Disengage PTO switch. Drive motor will stop.
5. Turn power switch to OFF position and remove key.
6. Attached unit to battery charger.
Operation Notes
The battery level indicator will only reset once the batteries have been fully charged.
Depending on extent of discharge and battery condition, allow approximately 7 hours for a com-
plete recharge before additional use (an optional heavy duty charger is available that will reduce
charge time to 3 hours).
Batteries must be removed before tipping unit to service position.