Ariens 22-Ton Log Splitter Specifications Page 17

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 16
10. Install the valve link onto the valve body,
as shown, using a 1/4 x 1 inch long clevis
pin. Secure the clevis pin with a cotter
pin (bend the ends of the cotter pin to
make it secure).
11. Install the valve handle onto the valve link
using a 1/4 x 3/4 inch long clevis pin.
Secure the clevis pin with a cotter pin
(bend the ends of the cotter pin to make
it secure).
12. Attach the valve handle to the valve spool
using a 1/4 x 1 inch long clevis pin.
Secure the clevis pin with a cotter pin
(bend the ends of the cotter pin to make
it secure). Attach the knob to the valve
handle, if necessary.
13. Attach the high-pressure hose from the
filter assembly to the fitting on the side of
the valve. Securely tighten the hose fit-
ting.
NOTE: The high-pressure hose is self-seal-
ing and does not require any type of sealing
material. Tighten the fitting with a 10 inch
crescent wrench.
815-672-8596 15 Iron & Oak
Assembly Instructions
Page view 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 51 52

Comments to this Manuals

No comments